Project Relationship
Market
Slack Electrical is working alongside Sacyr Construction and the Florida Department of Transportation on improvements to the I-75 interchange at Pine Ridge Road, Exit 107, in Collier County. The company’s documented scope includes installation of overhead sign structures. These structures are part of a larger interchange improvement project that includes construction of a diverging diamond interchange under the Moving Florida Forward Infrastructure Initiative. The interchange redesign is intended to address congestion and improve roadway safety by reducing conflict points. Slack Electrical’s installation work supports the signage infrastructure needed for motorists to navigate the updated interchange.